|
 1989 16' Sun Mate
|
Hull is in great shape
|
|
|
Rotten floor came up rather easily
|
 Demolition time
|
|
 More Demo
|
Foam is saturated
|
|
Removed foam. Also removed 4 gallons of water
2 part foam DOES hold water.
Also, Stringers and transom were in great shape which is odd because usually they are rotten as well. Lucky....
|
 Cleanup
|
|
 Starting Reconstruction
|
Hull is all cleaned up. Cable/wiring pvc conduit glassed in.
I also glassed in a box under the back pvc elbow to allow for drainage into center box then to splash well.
|
|
|
A close up view- holes were drilled through the bottom of the pvc elbow to allow drainage
|
 PVC Conduit Drainage
|
|
 PVC Conduit Drainage
|
A brass through fitting with plug will be installed to allow drainage to splash well
|
|
|
Poured new foam flotation
|
 Foam
|
|
 Foam
|
Aft view
|
|
|
One of my indestructible floor pieces.....
|
 Fiberglass Floor
|
|
 Fiberglass Floor
|
Front section
|
|
|
Dry fit
|
 Fiberglass Floor
|
|
 Fiberglass floor
|
Front view
|
|
|
Rear view
|
 Fiberglass Floor
|
|
 Glassing Floor
|
Floor glassed in. I also reconfigured the storage boxes against the transom
|
|
|
(Insert New Description)
|
 Glassing Front Deck
|
|
 Front Deck
|
I also reconfigured the front deck to allow more storage and a larger casting platform
|
|
|
|
 Rear Storage Boxes
|
|
 Splash Well
|
(Insert New Description)
|
|
|
(Insert New Description)
|
 Prepping for Gelcoat
|
|
 More Prep Work
|
(Insert New Description)
|
|
|
Grey base with white and blue webbing
|
 Gelcoat Complete
|
|
 New Gelcoat
|
Aft View
|
|
|
Forward view
|
 New Gelcoat
|
|
 New Gelcoat
|
Another view
|
|
|
One more view
|
 New Gelcoat
|
|
 Re-rigged
|
Seat Glassed in and boat re-rigged
|
|
|
|
 Re-rigged
|
|
 Completed Project
|
Thanks for viewing my project.....
Believe it or not this little boat has caught bonita, dolphin, and even a sailfish. Hopefully with its new fiberglass floor it will catch many more in the years to come.
|
|