|
 Last Trip out before I Start
|
Out in the water for a run before Starting the Big Jobs
|
|
|
Making a start
|
 Making a start
|
|
 Wood Chips
|
The Floor was in Fairly poor condition (sorry no photos of floor removal)
|
|
|
After having a bit of a dig around the Transom i realised it had to be all replaced.........Dred!
|
 The Transom
|
|
 The Transom 2
|
Not fun!
|
|
|
(Floor reomved, Stringers yet to come out All wood is getting replaced
|
 The floor (or where it was)
|
|
 The Transom almost removed
|
This is part of the Transom almost all gone, A little bit to do. I Cleaned this back to the Glass with a Grinder that had a worn down wire brush attachment, Worked quite well.
|
|
|
As you will notice the outer skin is still intact so i just slotted the new Transom down the back. I used two pices of 15mm ply laminated together with Epoxy resin with Glue Additive.
|
 Transom Test fitting
|
|
 Inside View Of Transom Going in for test fitting
|
Inside View Of Transom Going in for Test fitting
|
|
|
close up of trial fitting
|
 Closer
|
|
 floor trial Fitting (seats just sitting there)
|
Getting Closer now. All that fibreglassing to go
|
|
|
The old Trailer being used as a template
|
 The Old Trailer
|
|
 New Trailer in the making
|
made out of glavinised tubular steel and bent and welded.
|
|
|
Almost in the Water
|
 Boat on trailer
|
|
 The Toys
|
The toys
|
|
|
sorry i dont have any inside photos at the moment (i did this project last year before i found this site I will post some soon
|
 the finished project ready for the water
|
|
 In the Water at the Shack
|
(Insert New Description)
|
|
|
Off for a ski, Thats me in the Water My Fater in Law is the Driver and a mate Posing standing up
|
 Finally in Action!!!!
|
|