Warning: Undefined array key "visitDate" in /home2/sap/public_html/header.php on line 6
Long Haul - Thumbnail View

Warning: Undefined array key "session_logged_in" in /home2/sap/public_html/header.php on line 612
home | shopping | contact | projects | login|join
     Long Haul       
Search Projects:
 
Materials Share Thumbnails Slideshow Tutorial

Long Haul
Submitted By: Realgun
Date Created: 12-10-2004
Description: Restoring a 1988 Bayliner Capri. This Boat was searched for on the net and draged home 1400 miles.
Related Projects: (Long Haul)
    Long Haul replacing controls
    Gas filler replacement
    Pedistal seating
    platform seating area
    Removing Pinstripes/polishing
    Wiring up
    Upholstry
    Tilt/Trim
    Tilt steering
Tools / Materials:     Go to the Boating Store
Search the Store:
<< Prev Displaying 10 - 18 of 53 Next >>

two holes?

Carpet dirty and floor is not solid seems mushy (Rear area starboard)

Carpet dirty and floor is not solid seems mushy (Rear area port)

Rear area under seat carpet removed

Floor port side

Floor removed over rear area

Starbaod rear area seating removed

Water on shovel

Staring removal of floor and seating.
<< Prev Displaying 10 - 18 of 53 Next >>
All projects on Shareaproject.com are user-submitted and should be used for reference information only. The projects are not intended to be complete "How-To" articles. Use the information contained in these projects at your own risk. Projects are not checked for completion, accuracy, or safety and therefore cannot be guaranteed in any way.
Outdoor Blog