|
|
 |
 |
| home |
| |
shopping |
| |
contact |
| |
projects |
| |
Warning: Undefined array key "session_logged_in" in /home2/sap/public_html/header.php on line 612
login | | | join |
|
 |
 |
 |
Part 5 in car powertrain assembly
|
 |
|
|
|
|
|
|
|
|
|
Part 5 in car powertrain assembly
|
|
|
|
Submitted By:
|
fixb52s
|
|
Date Created:
|
08-30-2007
|
|
Description:
|
The engine is in but needs everything hooked up. Suspension will be bolted in. The water pump is bolted on and plumbed. Intake manifold is assembled. Generally, the small stuff.
|
|
Related Projects:
|
1987 V8 Fiero GT
Part 1 Engine prep.
Part 2 V6 removal
Part 3 engine bay mods
Part 4 engine installation
(Part 5 in car powertrain assembly)
The rest of the minor details
|
|
|
|

Water pump
|

Pump drive
|

Suspension assembly
|

Tie rod mod
|

Axle shaft to transaxle
|

Back on the ground.
|
|
|
|
|
|
|
|
All projects on Shareaproject.com are user-submitted and should be used for reference information only. The projects are not intended to be complete "How-To" articles. Use the information contained in these projects at your own risk. Projects are not checked for completion, accuracy, or safety and therefore cannot be guaranteed in any way.
Outdoor Blog
|