|
|
 |
 |
| home |
| |
shopping |
| |
contact |
| |
projects |
| |
Warning: Undefined array key "session_logged_in" in /home2/sap/public_html/header.php on line 612
login | | | join |
|
 |
 |
 |
Stejcraft 4.1m Halfcab gut&reco
|
 |
|
|
|
|
|
|
|
|
|
|
|
First up
|
|
Strip the boat of everything. Most fittings and all electrics to be replaced.
Remove the rear deck.
To seperate the deck from the hull. I carefully used a jig saw with metal cutting blade to get through the stainless staples used to fasten the deck and hull together. The backwash well was'nt realy bonded with the transom very well and seperated with a fair go of prising and persuasion. Thankfully.
|
|
|
|
|
|
|
|
|
All projects on Shareaproject.com are user-submitted and should be used for reference information only. The projects are not intended to be complete "How-To" articles. Use the information contained in these projects at your own risk. Projects are not checked for completion, accuracy, or safety and therefore cannot be guaranteed in any way.
Outdoor Blog
|