Warning: Undefined array key "visitDate" in /home2/sap/public_html/header.php on line 6
14 Ft 'Ski-Boy' Restore - Tiny-Tannic - It's IN!! It's IN!! The transom is FINALLY installed - Slideshow View

Warning: Undefined array key "session_logged_in" in /home2/sap/public_html/header.php on line 612
home | shopping | contact | projects | login|join
     14 Ft 'Ski-Boy' Restore  - Tiny-Tannic       
Search Projects:
 
Share Thumbnails Slideshow Tutorial
<<
>>
It's IN!! It's IN!! The transom is FINALLY installed
May 05, 2006

Sorry for not having any during pictures, but this was a hurry and get it all in there before the resin starts to jell job.

Because the hull behind the lower part of the transom is less than 2 layers of Roven Woving and its thinner than the deck I added 2 layers of mat and 1 layer of cloth behind the transom before the wood was installed.

Actually I sized the 1st layer of mat to only cover the hull and glassed it in. No need for the fiberglass roller here and you use a short brush to dab or pat the resin on and into the mat.

Next we installed a layer of 7.5 oz cloth, same as we used for the floor. the cloth runs up under the deck moulding and ties everything together. We also left a flap in the motor well area so we could glass over top of the transom once it was installed. (More on that later)

Then we installed the 2nd layer of mat. We coated the back side of the wood transom with resin and stuck it in place. Clamping it in place is kind of interesting.
<<
>>
All projects on Shareaproject.com are user-submitted and should be used for reference information only. The projects are not intended to be complete "How-To" articles. Use the information contained in these projects at your own risk. Projects are not checked for completion, accuracy, or safety and therefore cannot be guaranteed in any way.
Outdoor Blog